2008 Predesign Manual
Entire Predesign Manual document (1.4 megabyte PDF)
Section 1 – General Information about Predesigns
- 1.1 Introduction to the Predesign Study
- Purpose of the Predesign Study
- Types of Studies

- What Questions do Predesigns Answer?
- Figure 1: Initial Capital Budget Request Components
- What Does Predesign Involve?
- Benefits of Predesign
- When is a Predesign Study Required?

- Use of Consultants
- Audience
- Overview
- Study Type 1 – Projects Between $1 Million and $5 Million
- Study Type 2 – Projects Greater than $5 Million
- Predesign Study Funding Standards
- 1.2 Predesign Review Process
- Timing of Submittal
- Review and Approval Authority
- Review Process
- 1.3 Other Considerations
- Building Quality Standards
- Energy Conservation
- LEED Requirements
- Coordination on Information Technology
- Coordination with the Department of Archeology and Historic Preservation
Section 2 – Contents of a Predesign Study
- 2.1 Sections of a Predesign Study
- The Predesign Report is an Eight-Part Report with an Appendix.
- 2.2 Executive Summary
- 2.3 Project Analysis
- Operational Needs
- Explore Alternatives
- Life-Cycle Cost Analysis
- Select an Alternative
- Scope and Project Description of Preferred Alternative
- Issues Identification
- Prior Planning and History
- Stakeholders
- Project Description
- Implementation Approach
- Project Management
- Schedule
- 2.4 Program Analysis
- Assumptions
- Existing Facilities Inventory
- Space Needs Assessment
- Space Requirements
- Future Requirements
- Codes/Regulations
- 2.5 Site Analysis
- Evaluating Potential Sites
- Minimizing Costly Mitigation Requirements
- Acquisition Process
- Projects without Selected Sites
- Preferred Site(s)
- 2.6 Project Budget Analysis
- Project Cost Estimate

- Relate the Budget to the Scope of Work
- Effective Utilization of Space
- Cost Estimating versus Cost Planning
- Projects Outside Cost Control Ranges
- Funding Sources
- 2.7 Master Plan and Policy Coordination
- Thurston County Master Plans
- Other Significant State Requirements
- 2.8 Facility Operations and Maintenance Requirements
- Operating Budget Impacts
- 2.9 Project Drawings/Diagrams
- Site Plans
- Building Plans
- Building Volumes
- 2.10 Appendix
- A - Predesign Checklist
- B - Program Analysis Section Detail
- C - Site Analysis Section Detail
- D - Project Budget Analysis Section Detail
- E - Guidelines for Preparing Capital Project Cost Estimates
- F - Forms
- CBS004 – Predesign Capital Project Request Report Summary Word version
- C3 – Benefit and Life Cycle Cost Analysis Summary Word version
Note: The files listed here are presented in Adobe PDF. If you don't have the Acrobat Reader already installed on your system, free download is available at the Adobe Web site.
Note: Forms referenced are presented in Microsoft Excel or Microsoft Word format. If you do not have Excel or Word, or compatible software, installed on your system, free Readers are available from the Microsoft Web site. To save these files, right-click on the document link and choose Save Target As from the menu that opens. Navigate to the desired folder and click the Save button.